Reference


    References

    Water Management Plants


    Client:

    JP VODNO PODRUČJE SLIVA RIJEKE SAVE
    BOSNIA & HERZEGOVINA


    Description of work:

    Main design of reconstruction of protective hydraulic plant of earth-bank of the river Sava and Bosna in the area of Odžačka Posavina-I phase

    Implementation period:

    2005

     

    Client:

    Elektroprivreda BiH
    BOSNIA & HERZEGOVINA


    Description of work:

    The utilization of hydroenergetic potential a river Boštica

    Implementation period:

    2009

     

    Client:

    Elektroprivreda BiH
    BOSNIA & HERZEGOVINA


    Description of work:

    The utilization of hydroenergetic potential a river Stupčanica

    Implementation period:

    2009

     

    Client:

    AD Vodovod i kanalizacija
    BOSNA I HERCEGOVINA


    Description of work:

    Sewage system of town Bijeljina-Main design 2 Phase, 3 Stage

    Implementation period:

    2009 - 2010

    Systems for Disposal of Ash

    Client:

    TE Kosovo B
    KOSOVO


    Description of work:

    Hydraulic transport of combustion products (fly and bottom ash) from TPP Kosovo B to mine open pits so as to reclaim devastated soil after exploitation of open pit coal mine. It will have great environment on protection of air and leaching water.

    Implementation period:

    2004-2006

     

    Client:

    JP Elektroprivreda BIH
    BOSNIA & HERZEGOVINA


    Description of work:

    Transport of fly ash from ESP (electrostatic precipitator) to the selling plant (silo+loading into trucks). Transport of fly ash from ESP to mixing facility and further on hydraulic transport of slurry to disposal site.

    Implementation period:

    2006 - 2008

     

    Client:

    Elektroprivreda Srbije (EPS)
    SERBIA


    Description of work:


    Replacing the existing system of ash disposal (10 litres of water to 1 kg of ash) at TPP Nikola Tesla B with hydraulic transport system for thick slurry (1 litre of water to 1 kg of ash).

    The Works included the project management, planning support, design, engineering, procurement, installation, testing, commissioning and setting to work of the new ash disposal system at Nikola Tesla B Power Station.

    This project included construction works on:

    • Ash Silos
    • Mixing & pumping house

    The following main components are constructed:
    • Conveyor systems
    • Compressors and air vessels
    • Silo’s and discharge equipment
    • Mixing units
    • Pumps
    • Pipelines for pneumatic ash transport and slurry piping system
    • Air system for pneumatic transport
    • Instrument air system
    • Electric wiring

    During the required shutdown time for each unit the following connections and final erection has done:

    • Conveyor belts for bottom ash are modified and connected to the new bottom ash system
    • Transport vessels are installed under the relevant hoppers
    • Connection to pre-installed pneumatic systems
    • Connection to electrical systems

    Implementation period:

    2007-2010

    Other Supporting Facilities

    Client:

    TERMINAL OF LIQUID FUELS, SARAJEVO
    BOSNIA & HERZEGOVINA


    Description of work:

    Quantitative and qualitative acceptance of equipment

    Implementation period:

    2000 - 2001

     

    Client:

    Federal Ministry of Phisical Planning and Environment
    BOSNIA & HERZEGOVINA


    Description of work:

    Jajce-reconstruction of river bed of Pliva and waterfall – II phase

    Implementation period:

    2005

     

    Client:

    Petrolinvest Sarajevo-
    BOSNIA & HERZEGOVINA


    Description of work:

    Service of design our designer
    in Paris- France

    Implementation period:

    2006 - 2007