BOSANSKI ENGLISH

Reference


    References

    Substations up to 420 kV

    Client:

    TENAGA NASIONAL BERHAD
    MALAYSIA


    Description of work:

    3 S/S 132/33/11 kV
    Turn key

    Implementation period:

    2000 - 2004

     

    Client:

    UNDP-ENRP
    IRAQ


    Description of work:

    6 new S/S
    132/33/11 kV i 33/11 kV
    Turn key

    Implementation period:

    2001 - 2004

     

    Client:

    Europen Agency for Recostruction Trepča,
    KOSOVO


    Description of work:

    Refurbishment of Shupkovac Substation in Trepča

    Implementation period:

    2005

     

    Client:

    THE MENAGMENT AND IMPLEMENTATION AUTHORITY OF THE GREAT MAN-MADE RIVER (GMMR) PROJECT - LIBYA


    Description of work:

    Performing all of the works and/or services necessary for the procurement, installation, testing, commissioning, operation and maintenance of a cathodic protection system for the P.C.C.P. of GMMR project

    Implementation period:

    2003 - 2007

     

    Client:

    Kurdistan Regional Government
    Ministry of Electricity - Ifraz
    IRAQ


    Description of work:

    Electrification for Ifraz - Water Project 33/3,3 kV Substations
    33 kV Under Graound Cables
    33 kV Overhead Lines
    Turn key

    Implementation period:

    2006 - 2007

     

    Client:

    GEC-General Elecrtic Comp.
    LIBYA


    Description of work:

    Rehabilitation 220 kV bays on S/S 220/30/11 kV Rabta and modification on two spare OHTL 220 kV bays to 220 kV Transfotmator bays

    Implementation period:

    2006 - 2007

     

    Client:

    KAHRAMAA
    Qatar General Electricity &Water Corporation
    QATAR


    Description of work:

    Supply & replacement of operating mechanism of 132kV & 66 kV GIS Circuit Breakers at OLD AIRPORT Substation

    Implementation period:

    2007 - 2008

     

    Client:

    GRTE-Sonelgaz Transport de l'Electricité
    ALGERIA


    Description of work:

    Turn key project 3 S/S 60/30 kV
    Ghrib, Ain Sefra & Labiodh Sid Cheikh

    Implementation period:

    2005 - 2009

     

    Client:

    GRTE-Sonelgaz Transport de l'Electricité
    ALGERIA


    Description of work:

    Turn key project 2 S/S 60/30 kV Sidi Ali, Ouled Mimoune and extension S/S Mosteganem 60/30 kV

    Implementation period:

    2005 - 2009

     

    Client:

    LISCO
    Libyan Iron and Steel Company
    LIBYA


    Description of work:

    „Expansion of New Substation 30-10kV in Misurata Libya,Iron and Steel Company“ on turn key basic.

    Implementation period:

    2007 - 2009

    Transmission Lines up to 500 kV

    Client:

    AGOCO
    LIBYA


    Description of work:

    66kV TL
    Engineering,design,
    procurement, manufacture,
    construction

    Implementation period:

    2002 - 2003

     

    Client:

    AGOCO
    LIBYA


    Description of work:

    220kV TL – 40km
    Engineering,procurement and construction

    Implementation period:

    2002 - 2004

     

    Client:

    EEPCO
    ETHIOPIA


    Description of work:

    230/132kV TL – 210 km
    Reconstruction

    Implementation period:

    2002 - 2004

     

    Client:

    JP Elektroprivreda BiH;HZ HB; RS
    BOSNIA & HERZEGOVINA


    Description of work:

    400 kV TL – 364 km
    Construction

    Implementation period:

    2003 - 2005

     

    Client:

    ELPCO
    LIBYA


    Description of work:

    220kV TL – 300 km
    Engineering,design, procurement

    Implementation period:

    2003 - 2005

     

    Client:

    EEPCO
    ETHIOPIA


    Description of work:

    132kV TL
    Turn key

    Implementation period:

    2004 - 2005

     

    Client:

    ELPCO–ASDADA
    LIBYA


    Description of work:

    66 kV – 8 km
    220 kV – 8 km
    Turn key

    Implementation period:

    2006

     

    Client:

    SONELGAZ
    ALGERIA


    Description of work:

    60kV – 105 km
    Turn key

    Implementation period:

    2004 - 2007

     

    Client:

    SONELGAZ
    ALGERIA


    Description of work:

    400 kV OUED ATHMANIA - SALAH BEY - 120 km
    Turn key

    Implementation period:

    2006 - 2007

     

    Client:

    Kurdistan Regional Government
    Ministry of Electricity - Ifraz
    IRAQ


    Description of work:

    33 kV – 24 km
    Turn key
    Electrification for Ifraz - Water Project

    Implementation period:

    2006 - 2007

    Underground Cables and Optical Cables

    Client:

    BH Telecom
    BOSNIA & HERZEGOVINA


    Description of work:

    Design of underground optical cables as a part of optical ring.

    Implementation period:

    2004 - 2005

     

    Client:

    SIEMENS AG
    ÖSTERREICH


    Description of work:

    110, 220 i 400 kV –
    410.898 km
    Elaboration for installation OPGW, installation of OPGW cable, splicing and measurement on the joint boxes

    Implementation period:

    2004 - 2007

     

    Client:

    JP Eektroprivreda BIH
    BOSNIA & HERZEGOVINA


    Description of work:

    35 kV i 110 kV – 54.585 kg
    Elaboration for installation OPGW, delivery and installation of OPGW cable, splicing and measurement on the joint boxes

    Implementation period:

    2006 - 2008

     

    Client:

    EEPCO
    ETHIOPIA


    Description of work:

    OPGW cable with 48 fibers for line (Gonder-METEMA) - Ethiopia

    Implementation period:

    2007 - 2008

     

    Client:

    BH Telecom
    BOSNIA & HERZEGOVINA


    Description of work:

    Contract for project documentation of construcion Optical Connection Line for Jezero-M.Grad-Veličevo

    Implementation period:

    2007 - 2008

     

    Client:

    LISCO
    Libyan Iron and Steel Company
    LIBYA


    Description of work:


    Execution of works on optical cable for
    expansion of New Substation 30-10kV in Misurata Libya, on turn key basic.

    Implementation period:

    2009 - 2010

     

    Client:

    GRTE SPA
    ALGERIA


    Description of work:

    Works on OPGW cable for contracts 2007/342/KDL/040 & 20087028/KDL.L/013
    (Execution of works connecting fibers, shooting pad on OPGW)

    Implementation period:

    2009 - 2010

     

    Client:

    KOSTT
    KOSOVO


    Description of work:

    560 km of 110kV & 220kV lines OPGW installation and telecommunication

    Implementation period:

    2009 - 2011

     

    Client:

    JP Elektroprivreda BiH, Sarajevo
    BOSNIA & HERZEGOVINA


    Description of work:

    Projektovanje, isporuka i ugradnja optičkih spojeva sa podzemnim kablovima
    Design, supply and installation of fiber optic connections and underground cables

    Implementation period:

    2009 - 2011

     

    Client:

    ELPCO
    ETHIOPIA


    Description of work:

    Ethio -Sudan power system Interconnection Project – works on OPGW cable

    Implementation period:

    2009 - 2011

    Automation and SCADA systems

    Client:

    SIEMENS, Sarajevo
    (Termoelectric Power Plant Tuzla)
    BOSNIA & HERZEGOVINA


    Description of work:

    Making of design documents, installation works, supervision

    Implementation period:

    2000 - 2001

     

    Client:

    JP Elektroprivreda BiH
    BOSNIA & HERZEGOVINA


    Description of work:

    Construction of project systems continuous power supply

    Implementation period:

    2001

     

    Client:

    BH Telecom
    BOSNIA & HERZEGOVINA


    Description of work:

    Working of design for local TC network

    Implementation period:

    2002

     

    Client:

    BH Telecom
    BOSNIA & HERZEGOVINA


    Description of work:

    Working of design for access TC networks

    Implementation period:

    2002

     

    Client:

    BH Telecom
    BOSNIA & HERZEGOVINA


    Description of work:

    Making of main design for access TC networks

    Implementation period:

    2003

     

    Client:

    BH Telecom
    BOSNIA & HERZEGOVINA


    Description of work:

    Making of projects documents

    Implementation period:

    2003

     

    Client:

    JP Elektroprivreda BiH, Elektroprenos Sarajevo
    BOSNIA & HERZEGOVINA


    Description of work:

    Delivery equipment of telecommunication

    Implementation period:

    2004

     

    Client:

    SIEMENS, Sarajevo
    BOSNIA & HERZEGOVINA


    Description of work:

    Designing and construction of the main installation

    Implementation period:

    2004

     

    Client:

    JP Elektroprivreda BiH, Elektroprenos, Reljevo
    BOSNIA & HERZEGOVINA


    Description of work:

    Delivery equipment of telecommunication

    Implementation period:

    2004

     

    Client:

    FD Sarajevo
    BOSNIA & HERZEGOVINA


    Description of work:

    Designing (video control system, central control, etc.)

    Implementation period:

    2004 - 2005

     

    Client:

    JP Elektroprivreda BiH, Ključ
    BOSNIA & HERZEGOVINA


    Description of work:

    Designing, delivery of equipment, construction works, installation, etc.

    Implementation period:

    2004 - 2005

     

    Client:

    BH Telecom
    BOSNIA & HERZEGOVINA


    Description of work:

    Delivery splicers for optical fiber cables

    Implementation period:

    2005

     

    Client:

    JP Elektroprivreda BiH
    BOSNIA & HERZEGOVINA


    Description of work:

    Design, delivery and installing of optical junction?s way with underground cables

    Implementation period:

    2005

     

    Client:

    SIEMENS, Sarajevo
    BOSNIA & HERZEGOVINA


    Description of work:

    Design of MCC for refrigerant
    towers, TPP Kakanj unit 5 and 6

    Implementation period:

    2005

     

    Client:

    KEK KOSOVO
    KOSOVO


    Description of work:

    Designing, delivery of equipment and commissioning in TPP Kosovo B
    (automation)

    Implementation period:

    2004 - 2006

     

    Client:

    Government of Brčko district,
    BOSNIA & HERZEGOVINA


    Description of work:

    Delivery equipment of hydrological automatic station

    Implementation period:

    2006

     

    Client:

    SIEMENS, Sarajevo
    (Termoelectric Power Plant Tuzla)
    BOSNIA & HERZEGOVINA


    Description of work:

    Design of mounting, dismounting and testing equipment and devices of automatic and MCC

    Implementation period:

    2006 - 2008

     

    Client:

    JP Elektroprivreda BiH
    BOSNIA & HERZEGOVINA


    Description of work:

    Design, equipment delivery and commissioning of electrical part and automation of internal pneumatic ash disposal in Termal Power Plant Tuzla.

    Implementation period:

    2009

     

    Client:

    KOST J.S.T
    KOSOVO


    Description of work:

    SCADA EMS & TELECOMMUNICATION (LOT2)
    (Installation and commisioning telecommunications equipment and OPGW splicing)

    Implementation period:

    2008 - 2011